a级毛片无码久久精品免费_柠檬福利第一导航在线_广东少妇大战黑人34厘米视频_色噜噜狠狠综曰曰曰

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Industry News

Safety inspection of simple building elevators

Source: Time:2017-12-26 09:31:23 views:

Simple building elevators are a type of vertical transportation machinery commonly used in construction enterprises. At present, due to the lack of a unified standard for the design and manufacturing of simple building elevators, there are more self manufactured ones.
Simple building elevators are a type of vertical transportation machinery commonly used in construction enterprises. At present, due to the lack of a unified standard for the design and manufacturing of simple building elevators, there are more self manufactured ones. Although some are produced by designated manufacturers, their safety and reliability are still poor. In addition, due to the fluidity and cross operation of construction, the dismantling, transportation, and installation of elevators can cause human damage and installation that does not meet safety requirements, resulting in the collapse of the frame, the falling of the hanging plate, the scattering of suspended objects, mechanical twisting and rolling, and electric shock accidents. Therefore, strengthening the safety inspection of simple building elevators, timely discovering hidden dangers and rectifying them, is an important measure to prevent injury accidents from occurring.

  The safety inspection items and requirements for simple building elevators include the following aspects: 1. Checking the foundation. Check if the foundation has sufficient strength. Is there a safety factor that can withstand twice the weight and load of the elevator. Whether the foundation soil is practical, the concrete should meet the standard, the foundation area should be 500mm larger than the circumference of the frame, and should be 200-300mm higher than the natural ground. Is the base installed with bolts. Have drainage ditches been set up on the basis. 2、 Check the frame. Start checking the frame during installation to ensure there is no detachment or cracking in the welding areas, and to check for any deformation or distortion in the rods. After the elevator is in operation, it should also be inspected. After the installation of the frame is completed, the bolts should be checked for tightness. Use a theodolite to check the verticality of the frame and the levelness of the slide. Is it within the allowable deviation range. Is the verticality of the guide rail and the deviation between the two guide rails less than 10mm. 3、 Check the hanging disc. Check whether the nodes of the components and the laying of the base plate are firm and flat, whether the automatic elevator door sill slides smoothly up and down, whether the rolling of the hanging disc in contact with the track is smooth, and whether the roller and track meet the requirements. 4、 Check the ground anchor. Ground anchors include cable wind rope ground anchors and winch ground anchors. Whether the anchor is buried in a flat and dry place, and whether there are trenches, underground pipelines, and underground cables within 2 meters around it. Whether the anchor material is selected according to regulations and rotten materials are not allowed to be used as anchors. During the load test, check whether the ground anchor has changed. During the operation of the elevator, it is necessary to regularly check whether the ground anchor is loose and whether it is feasible to connect with the cable wind rope. 5、 Check the winch. Whether the winch is installed on a site with a wide field of view and flat ground, and whether the distance between the winch and the frame meets the requirements; Is the winch fixed with ground anchors; Check if the winch is equipped with an operating shed that provides sun protection, rain protection, and prevents falling objects from heights. In addition, it is necessary to inspect the drum, coupling, and brake simultaneously. Is there any damage. 6、 Check electrical equipment. Whether to select electrical switches, wires, thermal components, fuses, etc. according to the capacity of the winch; Is the power box installed in a convenient location for operation, and are there door locks and rain protection facilities. Check the insulation condition of electrical circuits and equipment, whether reliable measures have been taken to connect to neutral and ground, and whether leakage protectors have been installed. Has a lightning protection grounding device been installed. Does the grounding resistance meet the requirements. 7、 Check safety devices and protective equipment. Simple elevator safety devices mainly include three types: suspended basket stopping device, suspended basket rope breaking device, and suspended basket height limit device. The safety protection facilities include the safety door of the loading platform on the suspended platform, the protective fence, the protective flat and vertical nets, and the protective shed. Before using a simple elevator, it is necessary to check whether the safety devices are complete and effective, whether the selection of safety protection facilities is reasonable, and whether the installation meets the requirements of the regulations. 8、 Conduct performance testing and inspection. After the inspection of the above items is completed and the problems found are resolved, a performance test inspection of the elevator should be carried out. The performance test inspection mainly includes three items: no-load test, static load test, and dynamic load test; Empty load test: Start the winch, lift and lower the basket three times each without load, and check whether the transmission parts, electrical equipment, safety devices, etc. are reliable. Static load test: First, conduct a rated load test, and then start with an overload of 5%, increasing by 5% each time until the overload reaches 50%. Lift the heavy object to the ground 100mm, hover for 10 minutes, and then lower the lifting plate. Check that the metal structure of the elevator is not deformed. The weld seam shall not be detached, the working mechanism shall have no abnormal phenomena, the brake shall be reliably braked, the cable wind rope and ground anchor shall not be loose, the elevator base shall not sink, and the verticality of the gantry shall be within the specified standard range. Dynamic storage test: Overloaded by 25%, the basket is lifted continuously, braked 3 times, then lowered continuously, and braked 3 times again, and all working mechanisms are checked. Is the special brake sensitive and reliable.

Links

熟妇按摩高潮呻吟在线视频一区二区 | 91久久精品國產亞洲 | 爽灬爽灬爽灬毛少妇的性视频 | 真实偷拍激情啪啪对白 | 国产寡妇婬乱A毛片视频风落 | 欧美中文无码精品 | 300一级黄色毛片 | 一级黄色视频野外 | 国语对白清晰亚洲大尺度 | 日本一本二本三区在线观看 | 国产 熟女厨房全肉乱视频 在线观看黄色视频无码高清 | 日韩中文字幕一区二区 | 国产夫妻另类自拍A片网址在线观看 | 农民乡下农村一级毛片 | 4444www大胆无码视频α级 | 成人国产精品秘 18禁 | 国产白嫩精品久久久久久草莓 | 美女被操视频在线观看精品一区 | www.污污污www污污污在线观看视频 | 制服丝袜裸体波多野结衣 | 熟妇综合国产激情 | 成人精品3D动漫在线观看 | 深夜a片在线免费看网站入口 | 久6视频在线观看免费 | 成人国产精品秘 在线看sm | 国产激情盗射一区 | 国产一级免费AV | 亂伦国产一区二区七猫 | 后入内射国产一区 | 亚洲精品久久久久久 | а天堂中文在线官网在线 | 亚洲性爱视频在线免费观看 | 精品久久香蕉国产线看观看亚洲 | 国产成人黄色电影在线观看 | 欧美婬乱A片寡妇2 | 又粗又大又爽又黄少妇片 | 精品无码一区二区三区四区 | 少妇高潮惨叫久久麻豆传 | 五月天AV电影网 | 国产又爽又大又黄A片色戒一 | 做爰高潮A片宝贝 |